Start with the part that is hardest to inspect at production speed. List its critical tolerances, available clearance, production volume and reporting requirements. Give each supplier the same drawing and ask them to run the same demonstration.

Compare real operating conditions

Ask for the applicable machine performance specification and the conditions under which it applies. Provide the expected range of temperature and rate of change at the installation point, plus information about nearby vibration and contamination. Confirm how the proposed machine monitors conditions and handles compensation.

Run a test on your parts at representative conditions. Time the complete cycle, including loading, probe changes, measurement and saving the report. Include an unloading and reloading sequence. Check the measurements against a suitable reference method or artefact.

Include the work around the machine

Ask who will create and maintain programs, what training is included, and how long service and replacement probes typically take. Check what happens when you need to move a program or export inspection data. If the machine must cover two shifts, include operators from both in the demonstration where possible.

Explore Metrology Vendors

Technical references NPL CMM measurement strategies

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

Sign In

Register

Reset Password

Please enter your username or email address, you will receive a link to create a new password via email.