Guides

Gage R&R for a CMM: What to Test Before Trusting the Report

A measurement program can repeat well on a part that stays clamped and still produce inconsistent results in production. Design the study around how the measurement is actually performed. Identify what changes during inspection Record who loads the part, what fixtures and programs are used, and whether the setup changes across shifts. Include representative parts […]

Guides

How to Evaluate a Shop-Floor CMM Before Buying

Start with the part that is hardest to inspect at production speed. List its critical tolerances, available clearance, production volume and reporting requirements. Give each supplier the same drawing and ask them to run the same demonstration. Compare real operating conditions Ask for the applicable machine performance specification and the conditions under which it applies. […]

Sign In

Register

Reset Password

Please enter your username or email address, you will receive a link to create a new password via email.